The client needed new aseptic capacity on a compressed schedule, with minimal construction activity beside a live GMP production area and a clear path through qualification.
Wonclean engineered a pre-assembled suite with integrated air handling, HEPA filtration, pressure cascade controls, utilities and environmental monitoring. Factory acceptance testing was completed before the modules were shipped and connected on site.
The project package was coordinated as a complete system, keeping architectural, mechanical and controls interfaces aligned from design through qualification.
Share your process, classification and schedule requirements. Our team will recommend the right PAC or SAC approach.